|
|
View Forum Thread
Anyone can view the forums, but you need to log in in order to post messages.
> Forum Home >
Feature Requests >
maximal job failur counts
|
Tue, 16/Aug/2011 4:34 PM |
QuakeMarine1
177 Posts
|
beside maximal engine failurs a maximal job failurs + maximal work failurs whould be helpfull
not funny to have 300 engines fail on job before I notice the problem
|
|
|
|
Thu, 18/Aug/2011 9:40 PM |
Robin
1138 Posts
|
Yes, I have noticed similar problem before myself. I will add this into the next release.
Thanks
-robin
|
|
|
|
Thu, 20/Oct/2011 10:40 AM |
Jamie
102 Posts
|
Hi Robin,
Which release is that likely to be in? 2011.1 or 2012?
thanks
J
|
|
|
|
Thu, 20/Oct/2011 8:33 PM |
Robin
1138 Posts
|
Aiming for that in the 2012 release, which I'm aiming to release in December or January. Also, it looks like the new database will not be fully implemented for the 2012 production release at that time. We are aiming to be beta testing by Christmas, but working the kinks out of the new system will probably involve some time beyond the next Smedge release.
Thanks,
-robin
|
|
|
|
Wed, 09/Nov/2011 8:00 PM |
Robin
1138 Posts
|
FYI, This feature is now implemented, so it will be available in the Smedge 2012 release. The feature works by adding a new failure limit. There are now 3 limits you can set up:
Limit Name | Old Name | What it does | Default |
Maximum times an Engine can fail on a Job | Maximum Job Failures | This is the number of times that a specific Engine can fail on a specific Job before that Engine won't try to render that Job anymore. | 5 |
Maximum times an Engine can fail on a Product | Maximum Job Type Failures | This is the number of different Jobs of a specific Product that a specific Engine can fail on abefore that Engine won't try to render any Jobs of that type anymore. | 5 |
Maximum times a Job can fail | (new) | This is the maximum number of failures from any Engines that a Job is allowed to have before no more work from that Job will be sent out. | 15 |
Edited by author on Wed, 09/Nov/2011 8:01 PM |
|
|
|
Fri, 25/Nov/2011 8:07 AM |
Jamie
102 Posts
|
Champion Robin, that's been well worth the effort in my books. Thanks for that. I'll be able to use the paused job event in herald to trigger the usual sequence of events here on out.
Got a busy spell of pipeline updates happening here, smedge 2012 is amongst em, will let you know how that goes post new year. :D
Cheers
Jamie
|
|
|
|
|
|
. |